News and Announcements

New Quiet Path Bridge Complete

A new bridge on the Quiet Path has been constructed between fields D and E. This is to replace the bridge that was permanently closed due to safety issues resulting from a foundation failure. The new bridge was designed and built in-house by the Stowe Parks Department for approximately $6,000 in materials. It lies outside of the Flood Zone and is about halfway between the previous bridge location and Weeks Hill Road.